DFW AIRPORT CONSOLIDATED HEADQUARTERS PARKING GARAGE

16677_003_originaljpeg

The main force resisting system for this structure is conformed of Cast in place concrete frames which serve to carry the lateral and gravity loads. The floor framing is comprised of precast double tees. The loads are transfered to deep pier foundation.













Estructural SteelREINFORCED CONCRETE
WIND DESIGNPRECAST
BUILDING INFORMATION MODELINGCONSTRUCTION ADMINISTRATOR
Aviation
Parking

  • COMPLETED2012
  • LOCATIONDFW, TX
  • PARKING SPACES520
  • CLIENTDFW AIRPORT
  • ARCHITECTHKS

Need an advice? Contact Us!